Industrial & Distribution
Built for industrial developers, manufacturers, and operators — distribution, processing, recycling, energy — where every late week is measurable money.
Industrial projects fail in the seams: between sitework and shell, between shell and process equipment, between substantial completion and actually operating. We build the seams into one schedule — design-build where it accelerates you, hard-bid where it protects you, and equipment integration planned from day one instead of discovered at the end.
From tilt-up shells to process facilities with serious mechanical scope, our industrial work is led by people who understand that the building exists to serve the equipment inside it — not the other way around.
How it works
Site, utilities, power capacity, and a real budget against your pro forma — before design dollars are spent.
Drawings developed with your process engineer and equipment vendors at the table, so the slab, power, and clearances match the machines.
Earthwork, utilities, foundations, and structure on an accelerated track — the long, visible middle where schedule is won.
Equipment setting, mechanical/electrical tie-ins, and vendor coordination sequenced so installers aren't idling on site.
Startup support, punch, and phased occupancy if you need to begin operating one zone while we finish another.
Who does what
Past builds
Questions we always get
Design-build accelerates schedule and puts one throat to choke; plan-and-spec maximizes price competition on well-defined scope. We'll tell you package-by-package which serves you — often it's both on one project.
Yes — phased construction, temporary partitions, off-hours tie-ins, and coordinated shutdowns measured in hours, not days.
We schedule them like a trade: verified rough-ins, clear laydown, cranes and power when they arrive. Your vendors will notice the difference.
Long-lead buyout in precon, overlapping sitework and permitting, and a weekly look-ahead your team can actually read in the dashboard.
We manage a deep, repeat subcontractor bench and supervise with our own superintendents — you get local pricing with Cook accountability.
From plant TI to multi-million-dollar ground-up facilities. If it has a schedule someone's business depends on, it's our kind of job.